Gas-fired plant cannot skirt PJM-imposed penalty for veering from fuel cost policy: FERC

机译:燃气发电厂不能因燃料价格政策的变化而免于PJM施加的罚款:FERC

获取原文
获取原文并翻译 | 示例

摘要

CPV Shore will not be able to avoid a penalty imposed by PJMInterconnection for making cost-based energy offers that wereinconsistent with its effective fuel cost policy, the US Federal EnergyRegulatory Commission said in an order denying the natural gas-firedplant owner’s waiver request.The Competitive Power Ventures subsidiary argued its decision tosubmit offers based on a revised fuel cost policy that had not yet beenapproved by PJM should not incur a penalty as doing so allowed itsoffers on a day during the “bomb cyclone” winter storm to accuratelyreflect its true, and in some cases lower, costs.
机译:美国联邦能源 r n监管委员会在命令中说,CPV Shore将无法避免PJM r n互连网因提供基于成本的能源报价而产生的惩罚,该报价与其有效的燃料成本政策不一致。 r nCompetitive Power Ventures子公司辩称,其决定根据修订后的燃料成本政策提交报价,而PJM尚未批准该修订后的燃料成本政策,不会因此受到惩罚,因为这样做可以使“炸弹旋风”冬季风暴中的白天准确地反映出真实的成本,在某些情况下还可以降低成本。

著录项

  • 来源
    《Inside FERC 》 |2019年第29期| 6-6| 共1页
  • 作者

    Jasmin Melvin;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号