首页> 外文期刊>Inside FERC >FERC backs PJM plan for valuing new transmission despite developers’ protests
【24h】

FERC backs PJM plan for valuing new transmission despite developers’ protests

机译:尽管开发商抗议,但FERC支持PJM计划评估新的传输

获取原文
获取原文并翻译 | 示例
           

摘要

Proposed changes to PJM Interconnection’s benefit-cost analysis for electric transmission upgrades and expansions are just and reasonable, the Federal Energy Regulatory Commission determined last week. In issuing its decision Tuesday, FERC dismissed protests to PJM’s proposal from transmission developers NextEra Energy Transmission and ITC Holdings subsidiary ITC Mid-Atlantic Development. They argued the revisions would unfairly favor projects with earlier in-service dates, including smaller, more incremental market efficiency projects that can be completed more quickly.
机译:联邦能源监管委员会上周确定,对PJM互连公司对电力传输升级和扩展的收益成本分析的拟议变更是合理的。在周二发布的决定中,FERC驳回了输电开发商NextEra Energy Transmission和ITC Holdings子公司ITC Mid-Atlantic Development对PJM提议的抗议。他们认为,修订将不公平地青睐那些具有较早服务日期的项目,包括规模较小,增量更大,可以更快完成的市场效率项目。

著录项

  • 来源
    《Inside FERC》 |2019年第25期|9-9|共1页
  • 作者

    Molly Christian;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号