An empirical study on the implementation and evaluation of a goal-driven software development risk management model

机译:目标驱动的软件开发风险管理模型的实施和评估的实证研究

获取原文
获取原文并翻译 | 示例
           

摘要

Context: Building a quality software product in the shortest possible time to satisfy the global market demand gives an enterprise a competitive advantage. However, uncertainties and risks exist at every stage of a software development project. These can have an extremely high influence on the success of the final software product. Early risk management practice is effective to manage such risks and contributes effectively towards the project success. Objective: Despite risk management approaches, a detailed guideline that explains where to integrate risk management activities into the project is still missing. Little effort has been directed towards the evaluation of the overall impact of a risk management method. We present a Goal-driven Software Development Risk Management Model (GSRM) and its explicit integration into the requirements engineering phase and an empirical investigation result of applying GSRM into a project. Method: We combine the case study method with action research so that the results from the case study directly contribute to manage the studied project risks and to identify ways to improve the proposed methodology. The data is collected from multiple sources and analysed both in a qualitative and quantitative way. Results: When risk factors are beyond the control of the project manager and project environment, it is difficult to control these risks. The project scope affects all the dimensions of risk. GSRM is a reasonable risk management method that can be employed in an industrial context. The study results have been compared against other study results in order to generalise findings and identify contextual factors. Conclusion: A formal early stage risk management practice provides early warning related to the problems that exists in a project, and it contributes to the overall project success. It is not necessary to always consider budget and schedule constraints as top priority. There exist issues such as requirements, change management, and user satisfaction which can influence these constraints.
机译:背景信息:在最短的时间内构建高质量的软件产品以满足全球市场需求,为企业带来了竞争优势。但是,在软件开发项目的每个阶段都存在不确定性和风险。这些可能对最终软件产品的成功产生极大的影响。早期风险管理实践可有效管理此类风险,并为项目成功做出有效贡献。目标:尽管采用了风险管理方法,但仍然缺少解释将风险管理活动整合到项目中的详细指南。很少有人致力于评估风险管理方法的总体影响。我们提出了一种目标驱动的软件开发风险管理模型(GSRM),并将其明确集成到需求工程阶段,以及将GSRM应用于项目的实证研究结果。方法:我们将案例研究方法与行动研究相结合,从而使案例研究的结果直接有助于管理所研究的项目风险,并确定改进所提出方法的方法。从多个来源收集数据,并以定性和定量的方式进行分析。结果:当风险因素超出项目经理和项目环境的控制范围时,很难控制这些风险。项目范围影响风险的所有方面。 GSRM是一种可以在工业环境中使用的合理风险管理方法。将研究结果与其他研究结果进行比较,以概括研究结果并确定背景因素。结论:正式的早期风险管理实践可提供与项目中存在的问题相关的预警,并有助于整个项目的成功。不必总是将预算和进度限制视为头等大事。存在诸如需求,变更管理和用户满意度之类的问题,这些问题可能会影响这些约束。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号