NEW RESULTS ON SEQUENCING WITH RATE MODIFICATION

机译:速率修改排序的新结果

获取原文
获取原文并翻译 | 示例
       

摘要

In many production systems a time period is scheduled for machine maintenance, during which the machine is idle. After the maintenance activity is completed the production rate may be affected. The decisions under consideration are (ⅰ) when to schedule this rate-modifying activity, and (ⅱ) how to sequence the jobs. We study three single machine scheduling problems with a rate-modifying activity: minimum makespan with precedence constraints, minimum makespan with a learning effect and minimum number of tardy jobs. We introduce a polynomial time solution for each of the three problems.
机译:在许多生产系统中,为机器维护安排了一段时间,在此期间机器处于空闲状态。维护活动完成后,生产率可能会受到影响。所考虑的决定是(ⅰ)何时安排此费率调整活动,以及(ⅱ)如何对作业进行排序。我们研究了三个具有速率修改活动的单机调度问题:具有优先约束的最小makepan,具有学习效果的最小makepan和最少的迟到工作数量。我们针对这三个问题分别介绍了多项式时间解。

著录项

  • 来源
    《INFOR》 |2003年第2期|p.155-163|共9页
  • 作者单位

    School of Business Administration and Department of Statistics, The Hebrew University, Mount Scopus, Jerusalem 91905, Israel;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 计算技术、计算机技术;
  • 关键词

    scheduling sequencing;

    机译:安排排序;
  • 入库时间 2022-08-18 00:19:39

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号