首页> 外文期刊>IEEE Computer Applications in Power >Multiarea transfer capability: is a methodology needed?
【24h】

Multiarea transfer capability: is a methodology needed?

机译:跨区域传输能力:是否需要一种方法?

获取原文
获取原文并翻译 | 示例
       

摘要

A survey made to identify the magnitude and severity of the simultaneous transfer problem and how electric utilities are attempting to cope with this problem is described. Its purpose was to assess the industry's need, experience, and concerns in the area of simultaneous transfer capability analysis. The authors describe the survey preparation along with the results from the mail survey and follow-up interviews. The responses to various questions are tallied, and the various programs identified by the respondents are enumerated. The results indicate that there is no clear definition in the electric utility industry for multiarea transfer capability analysis. A comprehensive method/package that interrelates all area transfer capabilities in a multiarea system does not exist.
机译:描述了一项调查,该调查旨在确定同时转移问题的严重性和严重性以及电力公司如何试图解决该问题。其目的是评估行业在同步传输能力分析方面的需求,经验和关注点。作者描述了调查准备以及邮件调查和后续采访的结果。记录了对各种问题的回答,并列举了受访者确定的各种程序。结果表明,在电力行业中,对于多区域传输能力分析没有明确的定义。不存在将多区域系统中所有区域传输功能相互关联的综合方法/程序包。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号