首页> 外文期刊>Highways >Solutions to bridges of size
【24h】

Solutions to bridges of size

机译:尺寸桥梁的解决方案

获取原文
获取原文并翻译 | 示例

摘要

A £1.9 million project to install 750-metres of new parapet over bridges on the M4/M5 Almondsbury intersection near Bristol, called for a quick and innovative solution. The Sistema team were called in to install their SteelGard barriers - beginning work in early November and successfully completing the job in about ten days. Sistema director, Jason Ferro, said the barrier's installation system -designed to give quick results and reduced costs - had made it ideal for the job, which was complicated by a very tight curvature in some areas. The lightweight Sistema parapets snapped into place simply and quickly over the old obsolete 1970s barriers. And the lightweight design (at about 160kg per metre) meant there was little structural change needed on the bridge.
机译:一项耗资190万英镑的项目要求在布里斯托尔附近的M4 / M5 Almondsbury交叉口上的桥上安装750米的新护墙,呼吁寻求一种快速,创新的解决方案。 Sistema团队被要求安装他们的SteelGard屏障-从11月初开始工作,并在大约十天内成功完成了该工作。 Sistema主管Jason Ferro表示,该屏障的安装系统(旨在快速产生结果并降低成本)使其成为工作的理想之选,因为某些区域的弯曲非常紧,这使其变得复杂。轻巧的Sistema栏杆可在旧的1970年代过时的障碍物上迅速轻松地固定到位。轻巧的设计(每米约160公斤)意味着桥梁上几乎不需要进行结构上的改变。

著录项

  • 来源
    《Highways 》 |2004年第10期| p.1821| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 公路运输 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号