...
首页> 外文期刊>Highways + public works >Partnership approach pays off on Berkshire repair job
【24h】

Partnership approach pays off on Berkshire repair job

机译:伙伴关系方法为伯克希尔维修工作带来了回报

获取原文
获取原文并翻译 | 示例

摘要

When the condition of a 3km stretch of the A404 trunk road near Maidenhead in Berkshire became a serious problem, resurfacing the carriageway with traditional materials was not the only route forward. EnterpriseMouchel, the managing agents for Area 3 on behalf of the Highways Agency in the Thames Valley and Central Southern England, approached Tarmac National Contracting to provide the best technical solution for repairing the carriageway within tight timescales. To give a new lease of life to the A404, between junction 8 / 9 of the M4 and the A4, Tarmac's technical team was tasked with providing a quick, effective and durable solution to repair the road. Around 6, 600 tonnes of Masterlayer, a strong, flexible binder course and Masterflex, a thin surface course was laid by Tarmac National Contracting during two weekend possessions in August.
机译:当伯克郡梅登黑德附近的A404主干道延伸3公里的状况成为严重问题时,用传统材料重铺车道并不是唯一的前进路线。 EnterpriseMouchel代表泰晤士河谷和英格兰中南部的公路局代表了3区的管理代理,他们与Tarmac National Contracting取得了联系,为在紧张的时间内维修车道提供了最佳的技术解决方案。为了使M4和A4交界处8/9之间的A404焕然一新,Tarmac的技术团队的任务是提供快速,有效和持久的解决方案来修复道路。在8月的两次周末拍卖中,Tarmac National Contracting铺设了约6,600吨的Masterlayer(一种坚固,灵活的粘合剂层)和Masterflex(一种薄表面的层)。

著录项

  • 来源
    《Highways + public works 》 |2009年第8期| p.262831| 共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号