...
【24h】

New way to lay

机译:铺设的新方法

获取原文
获取原文并翻译 | 示例

摘要

The project was awarded to Highway Management (Scotland) Ltd - a consortium lead by Bilfinger Berger UK Ltd, John Graham (Dromore) Ltd and Northstone - as a Design, Build, Finance and Operate (DBFO) project thus allowing an innovative and contemporary approach to pavement design based on the principles of performance testing.rnBardon Composite Pavements (BCP) were employed to supply, mix and pave 45,000m~3 Cement Bound Granular Material (CBGM) sub base on the (off line) mainline carriageways. BCP were also awarded the contract to paver lay 38,000m~3 Type 1 sub base on side and slip roads.
机译:该项目被授予Bilfinger Berger UK Ltd,John Graham(Dromore)Ltd和Northstone牵头的财团Highway Management(Scotland)Ltd,作为设计,建造,财务和运营(DBFO)项目,从而实现了创新和现代的方法rnBardon复合路面(BCP)用于在(离线)干线行车道上供应,混合和摊铺45,000m〜3水泥粘结粒状材料(CBGM)地基。 BCP还获得了在人行道和支路铺设38,000m〜3型1型子路基的合同。

著录项

  • 来源
    《Highways + public works 》 |2010年第8期| p.34| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号