...
首页> 外文期刊>Highways + public works >Colas plays vital role in Tyne Tunnel construction
【24h】

Colas plays vital role in Tyne Tunnel construction

机译:可乐在泰恩河隧道建设中起着至关重要的作用

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Road construction has started through the New Tyne Crossing (NTC), with operations for building the carriageway progressing in close coordination with other work in the tunnel. Having made good progress with tunnel construction, the main NTC design and build contractor Bouygues Travaux Publics has awarded a road building and surfacing contract to Colas, which is also now working at a rapid pace.Since award of its contract in December 2009 and after starting work in earnest in January, Colas has completed construction of carriageway up to base course level in the 300m of cut and cover tunnel on the north bank of the Tyne. The contractor is now working in the 1.1km southern approach tunnel, while also building foundations, drainage and pavement of the toll plaza at the northern end of the NTC.
机译:新泰恩河穿越(NTC)已开始进行道路建设,与隧道中的其他工作密切配合,道路建设工作也在进行中。 NTC的主要设计和建筑承包商Bouygues Travaux Publics在隧道建设方面取得了良好的进展,已向Colas授予了道路建设和表面处理合同,该项目现在也正在迅速开展。自2009年12月授予合同以来1月份,Colas认真工作,完成了泰恩河北岸300 m切割和覆盖隧道中行车道的施工,直至基层。承包商现在正在向南1.1公里的引水道工作,同时还在NTC北端建造收费站的地基,排水和人行道。

著录项

  • 来源
    《Highways + public works》 |2010年第3期|p.23-24|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号