...
首页> 外文期刊>Highways >The Hindhead Tunnel: A case study
【24h】

The Hindhead Tunnel: A case study

机译:Hindhead隧道:案例研究

获取原文
获取原文并翻译 | 示例

摘要

Early in 2007, after decades of planning, construction started on the Hindhead Tunnel - the UK's longest underland road tunnel -near Hindhead in Surrey. Now, more than four years on, the new four mile bypass is about to open to traffic. Most drivers in South East England will be familiar with traffic bulletins announcing 'the usual queues at Hindhead' each morning and afternoon as their daily commute is underway. 30,000 of them each day experience the queues for themselves. The tunnel will make these delays a thing of the past, and also comes with a host of other benefits, for road users, the environment and local people alike.
机译:经过数十年的规划,2007年初,在英国萨里的辛德黑德(Hindhead)附近,兴建了英国最长的地下公路辛德黑德隧道。现在,已经过去四年多了,新的四英里旁路即将通车。英格兰东南部的大多数驾驶员将在每天通勤途中于每天早晨和下午宣布“通常在欣德黑德排队”的交通公告。每天有30,000人自己去排队。隧道将使这些延误成为过去,并为道路使用者,环境和当地居民带来其他好处。

著录项

  • 来源
    《Highways 》 |2011年第6期| p.12-13| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号