...
首页> 外文期刊>Highways + public works >Markings allow rapid repairs
【24h】

Markings allow rapid repairs

机译:标记允许快速修复

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Last year the UK faced the coldest December in 100 years; this extreme weather had a tremendous adverse impact on the roads. This cold spell led to a number of visual road defects such as cracking, potholes and patching; that now need to be rectified but at local authorities' expense.Matt Scarsbrook, Advanced Technical Service Engineer in the Traffic Safety Systems division at 3M said: "The UK's road infrastructure is essential in the day-to-day running of the country. Prolonged road works or poor road surfaces can have a huge impact on everyday life, hampering seemingly simple tasks such as travelling to work or school due to long delays or diversions, not to mention the safety risks that poor roads can pose.
机译:去年,英国面临着100年来最冷的十二月。这种极端的天气对道路造成了巨大的不利影响。这种寒冷现象导致了许多视觉上的道路缺陷,例如开裂,坑洼和修补。 3M交通安全系统部门高级技术服务工程师Matt Scarsbrook表示:“英国的道路基础设施对于该国的日常运营至关重要。道路工程或不良的路面可能会对日常生活产生巨大影响,阻碍了看似简单的任务,例如由于长时间的延误或改道而去上班或上学,更不用说不良道路可能带来的安全隐患。

著录项

  • 来源
    《Highways + public works》 |2011年第3期|p.28|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号