Tronsport for London Engineers faced a race against time to strengthen and re-open the Hammersmith Flyover in time for the London 2012 Games. Now the team will be returning to the site next Autumn to work on the remaining eleven spans. Transport for London engineers will return to carry-out more strengthening work on the Hammersmith Flyover next year after an initial repair programme was successfully completed in time for the London 2012 Games.
展开▼
机译:Tronsport for London工程师面临时间争夺,以在2012年伦敦奥运会之前及时加强和重新开放Hammersmith天桥。现在,该小组将在明年秋天返回现场,在剩余的11个跨度上工作。伦敦工程师的运输将在明年伦敦2012年奥运会之前成功完成初步维修计划后,明年再返回哈默史密斯天桥进行更多的加固工作。
展开▼