...
首页> 外文期刊>Highways >Make time for winter
【24h】

Make time for winter

机译:为冬天腾出时间

获取原文
获取原文并翻译 | 示例

摘要

The Highways Agency cannot stop it snowing or the thermometer from falling, but it is as ready as it can be for winter. And it is asking road users to play their part by taking responsibility for their own driving and journeys - by planning their travel and being prepared for severe weather The Agency has the vital job of keeping England's motorways and major A-roads open during severe weather, and ensuring that road users can travel safely to their destinations. Its fleet of winter vehicles use the latest technology and techniques to treat roads and clear snow - using less salt than in the past, which makes the fleet more effective and helps the environment.
机译:美国公路局无法阻止它下雪或温度计掉落,但是它已经准备好了,可以像冬天一样。它要求道路使用者对自己的驾驶和旅程负责-通过计划行程和为恶劣的天气做好准备。原子能机构的重要工作是在恶劣的天气下保持英格兰的高速公路和主要的A公路畅通,并确保道路使用者可以安全地前往目的地。其冬季车队使用最新技术来处理道路和清除积雪-比过去使用更少的盐分,这使车队更加有效并改善了环境。

著录项

  • 来源
    《Highways 》 |2013年第9期| 14-15| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号