首页> 外文期刊>Highways >Costain overhauls Balfour to claim top spot
【24h】

Costain overhauls Balfour to claim top spot

机译:Costain大修Balfour夺得头把交椅

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Costain has surged past Balfour Beatty to claim top spot after another bumper quarter saw the group's roads order book swell further. Costain was top in the quarterly tables for Q1 2015 and retained top spot in the latest quarter to June 2015 after winning, in joint venture with Skanska, the first two packages on the A1 project according to Glenigan's contracts leagues produced exclusively for Highways Magazine. The Costain/Skanska JV will work on a section from Alconbury to the East Coast Mainline, and another running from east of the East Coast Mainline to Swavesey. Elsewhere, Amey was amongst the front runners in the second quarter after bagging a major £235 million 10-year term maintenance contract for Trafford Borough Council, but a number of other major projects let in Q2 were taken by joint ventures.
机译:在另一个大丰收的季度看到该集团的道路订单进一步膨胀之后,Costain超越了Balfour Beatty,获得了头把交椅。根据Glenigan专为《公路杂志》制作的合同联盟,Costain在与Skanska的合资企业中获胜后,在2015年第一季度的季度表中名列前茅,并在截至2015年6月的最后一个季度中保持了头把交椅。 Costain / Skanska合资企业将在从阿尔康伯里(Alconbury)到东海岸干线(East Coast Mainline)的一段铁路上工作,另外一条将从东海岸干线(East Coast Mainline)东部到Swavesey。在其他地方,阿美(Amey)在第二季度成为领跑者之一,此前他为特拉福德自治市(Trafford Borough Council)签订了一项价值2.35亿英镑的十年期重要维护合同,但第二季度其他一些重大项目则由合资企业承担。

著录项

  • 来源
    《Highways》 |2015年第7期|12-13|共2页
  • 作者

    Steve Menary;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号