首页> 外文期刊>Highways >Team work at its best
【24h】

Team work at its best

机译:团队合作处于最佳状态

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

During the unprecedented rainfall of winter 2013, EM Highway Services (now Kier) worked with multiple partners, including the army, to support flood relief work in the community. Due to unprecedented levels of rainfall during the Caterham Bourne River in the London Borough of Croydon (LBC) had been steadily rising and reached critical levels in February 2014. As a result of the continuing rising levels, the water treatment plant at Kenley was at risk of being flooded. Had this been allowed to happen, the plant would have had to be shut down resulting in over 80,000 homes water supply being cut off.
机译:在2013年冬季史无前例的降雨期间,EM公路服务公司(现为Kier)与包括军队在内的多个合作伙伴合作,支持社区的抗洪救灾工作。由于伦敦克罗伊登区(LBC)的Caterham Bourne河上空前的降雨水平一直在稳定上升,并于2014年2月达到临界水平。由于不断上升的水平,肯利的水处理厂处于危险之中被淹。如果允许这种情况发生,该工厂将不得不关闭,从而导致超过80,000户家庭的供水被切断。

著录项

  • 来源
    《Highways》 |2015年第7期|74-74|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号