首页> 外文期刊>Highways >Kier retains HE contract
【24h】

Kier retains HE contract

机译:Kier保留了他的合同

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Kier Highways has retained its Area 3 maintenance and response contract with Highways England, securing a £190m deal that will run to October 2029. The contract begins on 1 November and covers the maintenance and operational response, including technology assets, for the strategic road network in Hampshire, Surrey, Oxfordshire, Wiltshire and parts of Buckinghamshire. Kier has delivered highway maintenance for Highways England in Area 3 since 2008. The network includes 237km of motorways on the M27, M3, M4, and 259km of trunk road (equating to 2,908 lane km in total) as well as around 740 bridges. It also includes the longest non-estuarial road tunnel in the UK - the Hindhead Tunnel at 1.83km long, which was the first tunnel in the UK to use radar-based incident detection. Joe Incutti, group managing director at Kier Highways, said: 'Our established team has accumulated a huge amount of knowledge and expertise since we were appointed in 2008.
机译:Kier Highways保留了与英格兰高速公路的3个维护和响应合同,确保了190万英镑的交易,该协议将于10月20日至10月。该合约于11月1日开始,涵盖战略公路网络(包括技术资产)的维护和运营响应,包括战略路网 在汉普郡,萨里,牛津郡,威尔特郡和白金汉郡的一部分。 自2008年以来,凯尔为高速公路提供了高速公路的高速公路维护。网络在M27,M3,M4和259公里的行李道路上(总共等于2,908车道,总共2,908千克)以及大约740座桥梁的高速公路。 它还包括英国最长的非河口道路隧道 - HINDHEAD隧道,距离英国的第一隧道是使用基于雷达的事件检测。 Kier Highdays董事总经理Joe Ivutti表示:“自2008年我们被任命以来,我们已建立的团队积累了大量的知识和专业知识。

著录项

  • 来源
    《Highways》 |2021年第5期|8-8|共1页
  • 作者

    Dominic Browne;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号