The Heads of the Valley project has run into more problems and Costain is facing a £45m hit after losing an arbitration ruling over its work on a retaining wall. The arbitrator found that responsibility for design information rested with Costain, which meant that additional costs associated with building the wall cannot be claimed as compensation
展开▼