...
首页> 外文期刊>Highways >Cleveland turns back time on Humber Bridge
【24h】

Cleveland turns back time on Humber Bridge

机译:克利夫兰在亨伯桥上倒转时间

获取原文
获取原文并翻译 | 示例

摘要

Cleveland Bridge has bagged a contract to inspect and refurbish cables on the Humber Bridge, which the Darlington-based steelwork specialist helped build more than four decades ago. The package includes inspecting the eight main 18 metre cable panels on the bridge, which is 2,220 metres long. Cleveland Bridge UK managing director Chris Droogan said: 'As one of the main partners in the construction of the Humber Bridge, I am really pleased that we can again apply our experience and expertise to ensure the extension of the lifespan of this vital and impressive piece of infrastructure.
机译:克利夫兰大桥(Cleveland Bridge)签订了一份合同,以检查和翻新亨伯桥(Humber Bridge)上的电缆,这家总部位于达灵顿的钢结构专家在四十年前协助建造了该电缆。该软件包包括检查桥上的八个主要的18米长电缆面板,这些电缆面板长2220米。克利夫兰大桥英国董事总经理克里斯·德鲁根(Chris Droogan)表示:“作为汉伯大桥建设的主要合作伙伴之一,我感到非常高兴的是,我们可以再次运用我们的经验和专业知识,确保延长这一至关重要而令人印象深刻的作品的使用寿命基础设施。

著录项

  • 来源
    《Highways 》 |2019年第3期| 11-11| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号