首页> 外文期刊>Hansa >Order from the JGC for FLNG
【24h】

Order from the JGC for FLNG

机译:从JGC订购FLNG

获取原文
获取原文并翻译 | 示例
           

摘要

Saacke Marine Systems received an initial order from Japan-based JGC Corporation in June 2014 to deliver a complete high temperature water boiler system - consisting of a fired hot water boiler with a dual-fuel burner and two heat recovery units - for Petro-nas' second floating liquefied natural gas (FLNG) facility. The facility is expected to start production in 2018. »Japan is a key international shipbuilding market for Saacke. That's why the order is a great success for our company, particularly in relation to the current market Situation,« explains Peter Breidenich, Director Business Unit Marine Systems.
机译:Saacke Marine Systems于2014年6月收到日本JGC Corporation的首笔订单,为Petro-nas公司提供一套完整的高温热水锅炉系统,该系统包括带双燃料燃烧器的燃热水锅炉和两个热回收装置。第二个浮动液化天然气(FLNG)设施。该设施预计将于2018年开始生产。»日本是Saacke的重要国际造船市场。这就是为什么该订单对我们公司取得巨大成功的原因,特别是相对于当前的市场形势而言。”海洋系统业务部总监Peter Breidenich解释说。

著录项

  • 来源
    《Hansa》 |2015年第9期|75-75|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号