首页> 外文期刊>Ground Engineering >GROUND IMPROVEMENT COLUMN CAMPAIGN
【24h】

GROUND IMPROVEMENT COLUMN CAMPAIGN

机译:地面改善列广告系列

获取原文
获取原文并翻译 | 示例
           

摘要

The famous Mullberry harbours vital to the D-Day landings were temporary structures built in secret and assembled in a matter of days. But the new docks being built at Algeciras on Spain's southern coast using similar techniques are being built in phases over several years and are clearly intended for the longer terra. The scheme to extend the port which sits within clear sight of the rock of Gibraltar, is part of a grander Spanish expansion. "All the harbours in Spain are growing as every year there is an increase in the transportation of containers and goods," says Alejandro Segundo Gonzalez, group contracts manager of Geocisa, which in joint venture with Pennine Vibropiling is handling the ground improvement at the Algeciras site.
机译:对D日登陆至关重要的著名Mullberry港口是秘密建造的临时结构,几天之内即可组装完毕。但是,使用类似技术在西班牙南部海岸的阿尔赫西拉斯(Algeciras)建造的新码头经过数年的分阶段建造,显然打算用于更长的土地。扩建位于直布罗陀岩石清晰可见的港口的计划是西班牙宏伟扩张计划的一部分。 Geocisa的集团合同经理Alejandro Segundo Gonzalez说:“西班牙的所有港口都在增长,每年集装箱和货物的运输都在增加。”该公司与Pennine Vibropiling合资经营着Algeciras的地面改善工程现场。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号