...
首页> 外文期刊>Ground Engineering >Thome one: Geotechnical risk management
【24h】

Thome one: Geotechnical risk management

机译:第一讲:岩土工程风险管理

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A nap's Tim Chapman's keynote lecture will consider the motivation of developers and why they fund construction projects. It will outline the proportion of costs typically spent on foundations as a proportion of whole building and whole life costs. The lecture will also look at UK government guidance on optimism bias and how better geotechnical design and risk management may reduce it. Chapman will draw on the findings of his keynote conference paper that states that significant construction delays due to ground problems may affect 20% of building projects. He will explain that the average cost of these delays far outweighs the cost of site investigation measures that might have avoided them.
机译:小睡的蒂姆·查普曼(Tim Chapman)的主题演讲将考虑开发商的动机以及他们为建筑项目提供资金的原因。它将概述通常在基础上花费的成本在整个建筑物和整个生命成本中所占的比例。讲座还将探讨英国政府关于乐观偏见的指导,以及更好的岩土工程设计和风险管理如何减少这种偏见。查普曼(Chapman)将利用他的主题会议论文的发现,该发现指出由于地面问题而导致的重大建设延误可能会影响20%的建筑项目。他将解释,这些延误的平均成本远远超过可能避免这些延误的现场调查措施的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号