...
首页> 外文期刊>Ground Engineering >Tech experts give green light to Messina crossing
【24h】

Tech experts give green light to Messina crossing

机译:技术专家为墨西拿过境开绿灯

获取原文
获取原文并翻译 | 示例
           

摘要

Technical sign-off for foundation design and other aspects of the gigantic Messina Straits crossing project between Italy and Sicily was expected as GE went to press. The scheme involves construction of the world's largest suspension bridge with a central span of 3.3km and 382m high pylons. Correspondingly deep and complex foundation structures are required in a seismically active area. Throughout July the board of directors of client Stretto di Messina has been assessing the results of a complex multi-part review of the design and construction proposals for the estimated €6bn project. It is anticipated that they will give the reviews a clean bill of health. The complex assessment process, under way since last December, is the most comprehensive technical and procedural checking given to any project in Italy.
机译:在GE付印之时,有望在意大利和西西里岛之间的巨型墨西拿海峡穿越项目的基础设计和其他方面进行技术批准。该计划涉及建造世界上最大的悬索桥,其中央跨度为3.3公里,塔高为382m。在地震活跃区域中需要相应的深而复杂的基础结构。整个7月份,客户斯特雷托·迪·墨西拿(Stretto di Messina)的董事会一直在评估对这一估计为60亿欧元的项目的设计和施工建议进行的复杂的多部分审查的结果。预计他们将为审核提供干净的健康单。自去年12月以来,正在进行的复杂评估过程是对意大利任何项目进行的最全面的技术和程序检查。

著录项

  • 来源
    《Ground Engineering》 |2011年第8期|p.4|共1页
  • 作者

    Adrian Greeman;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号