首页> 外文期刊>Ground Engineering >Jack up barge supports Lake Windermere site investigation
【24h】

Jack up barge supports Lake Windermere site investigation

机译:自升式驳船支持温德米尔湖遗址调查

获取原文
获取原文并翻译 | 示例
           

摘要

Fugro Engineering Services installed a 44t jack-up drilling barge on Lake Windermere in November as part of ground investigations for construction of a new United Utilities sewer. The 12m~2 platform was constructed in the lake at Lakeside, near Newby Bridge, before being towed up Windermere by two Cumbria class launches operated by Windermere Lake Cruises. The rig was used to drill five boreholes and carry out lake bed surveys of the Parsonage Bay area of lake for part of a £5M project due to be completed in 2013.
机译:辉固工程服务于11月在温德米尔湖上安装了44吨自升式钻井船,作为地面调查的一部分,以建造新的联合公用事业下水道。这个12m〜2的平台​​是在纽比桥附近的湖滨湖中建造的,然后由温德米尔湖巡游公司的两次坎布里亚级发射将温德米尔拖走。该钻机用于钻探五个钻孔,并对湖泊的帕森尼奇湾地区进行湖床调查,这是一项耗资500万英镑的项目的一部分,该项目将于2013年完成。

著录项

  • 来源
    《Ground Engineering》 |2012年第1期|p.6|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号