...
首页> 外文期刊>Ground Engineering >BEIJING METRO HITS MAJOR TARGET
【24h】

BEIJING METRO HITS MAJOR TARGET

机译:北京地铁的主要目标

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

China Railway Engineering Corporation (CREC) Bureau 5 has completed tunnelling on the final 2.3km section of the Line 6 metro in Beijing, China. The 6.15m diameter Robbins earth pressure balance tunnel boring machine completed the final drive on the 12km extension in less than three months. Ground conditions on the final section were challenging with loose, soft ground, as well as fine sands, and contractor CREC injected bentonite ahead of the cutter head to overcome the problem. Work is now underway on the fit out stage of the project, which will enable the seven new stations to open in September this year.
机译:中国铁路工程总公司(CREC)5局已经完成了在中国北京的6号线地铁最后2.3公里路段的隧道建设。直径6.15m的Robbins土压平衡隧道掘进机在不到三个月的时间内完成了12km延长线上的最终驱动。最后部分的地面条件充满挑战,要松散,柔软的地面以及细沙,承包商CREC在刀头之前注入了膨润土以解决该问题。该项目的装修阶段目前正在进行中,这将使七个新站于今年9月启用。

著录项

  • 来源
    《Ground Engineering》 |2014年第4期|5-5|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号