首页> 外文期刊>Ground Engineering >London mayor targets flabby TfI
【24h】

London mayor targets flabby TfI

机译:伦敦市长的目标是宽松的TfI

获取原文
获取原文并翻译 | 示例
           

摘要

London Mayor Sadiq Khan has said he wants to cut waste at 'flabby' Transport for London (TfL) in a new five-year business plan published last month. Infrastructure investments in the plan include bringing forward the extension of the Bakerloo Line, with a new completion date of 2028/9 rather than 2031. Other work includes introducing the Elizabeth line, new signalling on the Metropolitan, Hammersmith and City, District and Circle lines and further upgrading the Jubilee and Northern Line. Station upgrades to be completed include Victoria, Bond Street and Finsbury Park. In addition, modernisation of Camden and Holborn stations will start, the Northern line will be extended to Battersea, and the London Overground extended to Barking Riverside.
机译:伦敦市长萨迪克·汗(Sadiq Khan)表示,他希望在上个月发布的一项新的五年商业计划中减少“松弛的”伦敦运输(TfL)的浪费。该计划中的基础设施投资包括推进Bakerloo线的扩建,新完工日期为2028/9,而不是2031。其他工作包括引入Elizabeth线,Metropolitan,Hammersmith以及City,District和Circle线的新信号进一步升级禧年和北线。即将完成的车站升级包括维多利亚,邦德街和芬斯伯里公园。此外,将开始对卡姆登(Camden)和霍尔本(Holborn)车站进行现代化改造,将北线延伸至巴特西(Battersea),并将伦敦地上线(London Overground)延伸至Barking Riverside。

著录项

  • 来源
    《Ground Engineering》 |2017年第janaafeba期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号