...
首页> 外文期刊>Ground Engineering >Foundation repairs start on Scotland's only funicular railway
【24h】

Foundation repairs start on Scotland's only funicular railway

机译:在苏格兰唯一的缆索铁路上开始基金会维修

获取原文
获取原文并翻译 | 示例
           

摘要

Balfour Beatty has started foundation repairs on the 2km Cairngorm funicular railway, which has been closed since 2018. Operators plan to reopen the railway after a detailed options appraisal that also considered replacing it with alternative infrastructure or removing it entirely at a cost of £17M. In 2018 consultant Cowi led an investigation into the railway after inspectors raised safety concerns. The inspectors concluded that the structure did not present an immediate danger to the public.
机译:Balfour Beatty已经开始在2公里的Cairngorm Firicular铁路上进行基础修理,自2018年以来已关闭。经营者计划在详细的选择评估后重新打开铁路,也考虑使用替代基础设施或以1700万美元的成本替换它。 2018年顾问Cowi在检查员提出了安全问题后导致了铁路的调查。检查员得出结论,该结构对公众没有立即危险。

著录项

  • 来源
    《Ground Engineering》 |2020年第11期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号