Saturated sand ground conditions at a site in Montrose, Scotland has given foundation contractor Keller the perfect opportunity to deliver a UK first using an alternative secant pile wall design. Development of a new facility for a major oil and gas client called for construction of a test pit, but the high groundwater levels meant that the excavation phase would call for significant dewatering work. The client's engineer - Ramsay and Chalmers - contacted Keller to develop a solution for a retaining wall solution for the 16m long, 10m wide and 7m deep test pit, which will be filled with water for testing equipment for the oil and gas sector before deployment.
机译:苏格兰蒙特罗斯的饱和沙地条件在蒙特罗斯的遗址,给予了基金会承包商Keller使用替代剪辑桩墙设计首先提供英国的绝佳机会。为主要石油和天然气客户提供新设施的开发所谓的测试坑的建设,但高地下水位意味着挖掘阶段将呼吁显着的脱水工作。客户的工程师 - Ramsay和Chalmers - 联系Keller为1600万宽,10米宽,700万深度测试坑进行了一个挡土墙解决方案,该解决方案将在部署前填充水用于石油和天然气部门的测试设备。

著录项

  • 来源
    《Ground Engineering》 |2019年第6期|16-17|共2页
  • 作者

    Claire Smith;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号