首页> 外文期刊>Ground Engineering >Ground movement due to shaft construction
【24h】

Ground movement due to shaft construction

机译:竖井结构引起的地面运动

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Ground movement due to shaft construction can damage surrounding assets. A comprehensive synthesis of case studies of ground surface movement due to the excavation of circular shafts is presented herein. The data highlight the importance of considering shaft construction method when making empirical predictions.After subtracting significant settlement due to dewatering, two shafts at Crossrail's Limmo Peninsula tunnelling site have been added to the existing data set. This has confirmed that when wall installation occurs prior to excavation, shafts typically experience less ground surface settlement than when installation and excavation are concurrent.New design lines which differentiate between construction method are presented.
机译:竖井施工引起的地面运动会损坏周围的资产。本文介绍了由于圆形轴的开挖而引起的地表运动案例研究的全面综合。数据强调了进行经验预测时考虑竖井构造方法的重要性。 r n在减去因脱水而产生的大量沉降之后,将Crossrail Limmo半岛隧道工地的两个竖井添加到了现有数据集中。这已经证实,当在开挖之前进行墙体安装时,竖井通常比同时进行安装和开挖时竖井的地面沉降要少。 r n提出了区分施工方法的新设计思路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号