...
首页> 外文期刊>Greenwire >N.M. top court to hear new evidence on climate, power link
【24h】

N.M. top court to hear new evidence on climate, power link

机译:N.M.最高法院审理有关气候,权力联系的新证据

获取原文
获取原文并翻译 | 示例

摘要

The New Mexico Supreme Court will hear new evidence on the relationship between climate change and coal power generation as the Public Service Company of New Mexico's energy plan faces review by the Land of Enchantment's highest court. PNM, the state's largest electric utility, wants to replace the power from two of four units at its San Juan County coal plant that's being prepared to shut down. Last December, the state's Public Regulation Commission signed off on a plan to allow PNM to continue operating those two units as long as carbon capture measures were installed.
机译:新墨西哥州最高法院将对新墨西哥州能源计划的公共服务公司进行审查,因此新墨西哥州最高法院将听到有关气候变化与煤炭发电之间关系的新证据。 PNM是该州最大的电力公司,希望更换其准备关闭的圣胡安县燃煤电厂的四个机组中的两个机组的电源。去年12月,该州的公共管理委员会签署了一项计划,只要安装了碳捕集措施,该计划便允许PNM继续运营这两个装置。

著录项

  • 来源
    《Greenwire 》 |2016年第28期| 1-3| 共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号