...
首页> 外文期刊>Greenwire >Greens sue over water permit for power plant
【24h】

Greens sue over water permit for power plant

机译:绿党起诉电厂取水许可证

获取原文
获取原文并翻译 | 示例

摘要

Environmentalists opened up a new front in the legal wrangling over the future of a controversial power plant on the Navajo reservation.rnIn a petition filed in the 9th U.S. Circuit Court of Appeals, green groups allege EPA has failed to update a water pollution permit for the Four Comers Generating Station.rnEPA last issued a National Pollutant Discharge Elimination System (NPDES) permit for Four Comers in 2001. It expired more than 12 years ago.rn"EPA is in violation of the [Clean Water Act] and its own implementing regulations," the petition for writ of mandamus in the 9th Circuit says.
机译:环保主义者在纳瓦霍保留地上有争议的发电厂的未来法律争端上开辟了一条新的战线。在第9届美国巡回上诉法院提交的请愿书中,绿色团体声称EPA未能为该州更新水污染许可证。四角发电站。rnEPA最后一次在2001年为四​​角发行了国家污染物排放消除系统(NPDES)许可证。它已过期12多年了。rn“ EPA违反了《清洁水法》及其实施条例。 ”,第9巡回法院的令状要求书。

著录项

  • 来源
    《Greenwire 》 |2018年第may24期| 1-2| 共2页
  • 作者

    Amanda Reilly;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号