首页> 外文期刊>Greenwire >'Time bomb': Mich. panel preps dam safety recommendations
【24h】

'Time bomb': Mich. panel preps dam safety recommendations

机译:'Time Bomb':MICH。面板准备大坝安全建议

获取原文
获取原文并翻译 | 示例
           

摘要

A group responsible for offering new safety measures after two Michigan dams failed last summer destroying 150 houses and causing over $200 million damage delayed sending the governor its final recommendations, which include increased monitoring of dams and other risk reduction measures. The Michigan Dam Safety Task Force has been working on recommendations that would require Legislature approval to reduce the threat of dam failures after two dams failed in Midland County last May, forcing the evacuation of 10,000 people. Among the 86 recommendations from the task force is that owners of all high and significant hazard dams would be required to provide surveillance and monitoring plans to the Michigan Department of Environment, Great Lakes and Energy. They also would be required to have independent reviews performed at least every 10 years. Inspections could be required annually for high hazard dams and every other year for significant-hazard dams. The failure of the Edenville Dam, which led to the failure of the Sanford dam and the flooding of Midland County, had a history of violating safety regulations.
机译:一个团体负责在两名密歇根州坝上失败后发出新的安全措施,最后夏季摧毁了150所房屋,并造成超过2亿美元的伤害延迟将总督延迟其最终建议,包括增加对水坝和其他风险降低措施的监测。密歇根大坝安全工作组一直致力于需要立法批准,以便在米德兰县的可能性失败后减少大坝失败的威胁,迫使10,000人撤离。在工作队的86个建议中,所有高和重要的危险水坝的所有者都需要为密歇根州环境,大湖泊和能源提供监督和监测计划。他们还必须至少每10年进行独立的评论。对于高危险水坝,每隔一年都可以每年进行检查,而是针对显着危险的水坝。导致桑福德大坝失败和米德兰县的洪水失败的伊甸维尔大坝的失败有违反安全规定的历史。

著录项

  • 来源
    《Greenwire》 |2021年第4期|17-17|共1页
  • 作者

    Anna Liz Nichols;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号