Headquarters for the National Bank of Kuwait, a new 300-meter-tall building under construction, combines concrete, steel, glazing and glass-reinforced concrete in a unique shellfish shape. The engineering challenges behind this building led the engineers of Ahmadiah Company, the contractor, to use GNSS technology to install the core wall structure with millimeter accuracy. They adopted the core wall control survey method developed by Joel van Cranenbroeck during construction projects in Dubai. To guarantee the precise vertical thrust of a tower during construction, complete control must be maintained of the position of each new element erected on top of the existing core walls. Such new elements, and their formwork structures, must be precisely positioned with respect to the main axis of the design reference frame, defined as the vertical positioned in the tower center. This means that the position of the formwork structures at the top of the tower must be continuously measured during erection of the building.
展开▼
机译:科威特国家银行的总部是一栋新的300米高的建筑,正在建造中,它将混凝土,钢材,玻璃和玻璃纤维增强的混凝土结合成独特的贝类形状。这座建筑背后的工程挑战导致承包商Ahmadiah Company的工程师使用GNSS技术安装毫米级精度的核心墙结构。他们采用了Joel van Cranenbroeck在迪拜的建筑项目中开发的核心墙控制测量方法。为了保证在施工过程中塔的精确垂直推力,必须完全控制竖立在现有芯墙顶部的每个新元件的位置。此类新元素及其模板结构必须相对于设计参考框架的主轴精确定位,定义为位于塔架中心的垂直方向。这意味着在建筑物安装期间必须连续测量塔架顶部的模板结构的位置。
展开▼