首页> 外文期刊>Geotechnical testing journal >Closure to Discussion by Jae Chung and Henry Bollmann on 'Development of a Substructure Instrumentation System at the New 1-10 Twin Span Bridge and Its Use to Investigate the Lateral Behavior of Batter Piles'
【24h】

Closure to Discussion by Jae Chung and Henry Bollmann on 'Development of a Substructure Instrumentation System at the New 1-10 Twin Span Bridge and Its Use to Investigate the Lateral Behavior of Batter Piles'

机译:Jae Chung和Henry Bollmann讨论“在新的1-10双跨桥的子结构仪表系统的开发及其在研究击打桩横向性能中的应用”的讨论结束

获取原文
获取原文并翻译 | 示例
       

摘要

An instrumentation system was installed at M19 eastbound pier of the new I-10 Twin Span Bridge for short-term and long-term monitoring of the bridge, and was used to monitor the lateral behavior of the pier during a unique lateral load test. The system includes strain gauges, In-Place Inclinometers, triaxial accelerometers, water pressure cells, tiltmeters, and corrosion meters. The strains and deformations within the foundation piles were measured during the lateral load test using the strain gauges and IPI inclinometers. The horizontal movement of the pier was also monitored using an automated survey station. The results of lateral load test were compared with the FB-MultiPier predicted values. This article presents the closure to the discussion on the Geotechnical Testing Journal, GTJ103109, Vol. 34, No. 4.
机译:在新的I-10双跨桥的M19东行桥墩上安装了一个仪表系统,用于对桥的短期和长期监视,并在独特的横向载荷测试过程中用于监视桥墩的横向行为。该系统包括应变仪,就地测斜仪,三轴加速度计,水压传感器,倾角仪和腐蚀仪。使用应变仪和IPI倾斜仪在横向载荷测试期间测量了基桩内的应变和变形。码头的水平运动也使用自动测量站进行监控。将横向载荷测试的结果与FB-MultiPier预测值进行比较。本文介绍了对岩土工程测试杂志,GTJ103109,第34,第4号。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号