首页> 外文期刊>Geographical analysis >Hub Location Problem with Allowed Routing between Nonhub Nodes
【24h】

Hub Location Problem with Allowed Routing between Nonhub Nodes

机译:非集线器节点之间允许路由的集线器位置问题

获取原文
获取原文并翻译 | 示例
           

摘要

In this study, we relax one of the general assumptions in the hub location literature by allowing routed flows between nonhub nodes. In hub networks, different flows are consolidated and routed via collection, interhub, and distribution arcs. Due to consolidation, some flows travel long paths despite closeness of their origin and destination. In this study, we allow direct flows by penalizing by a scalar factor of original cost of transshipment between these arcs. We present mathematical models for median, center, and set covering versions of the problem for single- and multi-allocation cases. We test the models with the CAB and TR data sets. We discuss the properties of established direct connections for different models by using another mathematical model where the number of direct flows is bounded and interpret the effect of changes in problem parameters.
机译:在这项研究中,我们通过允许非集线器节点之间的路由流放宽了集线器位置文献中的一般假设之一。在集线器网络中,不同的流通过收集,集线器和分发弧进行合并和路由。由于合并,尽管一些流量的来源和目的地很近,但它们仍沿较长的路径行进。在这项研究中,我们通过对这些弧之间的原始转运成本的标量因子进行惩罚来允许直接流动。我们提供了针对单分配和多分配案例的中位数,中心数和集合覆盖问题版本的数学模型。我们使用CAB和TR数据集测试模型。我们使用另一个数学模型来讨论为不同模型建立的直接连接的属性,其中直接流动的数量是有界的,并解释问题参数变化的影响。

著录项

  • 来源
    《Geographical analysis》 |2015年第4期|1-21|共21页
  • 作者单位

    Department of Industrial Engineering Bilkent University Ankara Turkey;

    Department of Industrial Engineering Bilkent University Ankara Turkey;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号