...
首页> 外文期刊>Fusion Science and Technology >An Improved Near Term 14 MeV Neutron Test Facility for Fusion Power Plant Materials
【24h】

An Improved Near Term 14 MeV Neutron Test Facility for Fusion Power Plant Materials

机译:用于聚变电厂材料的改进的近期14 MeV中子测试设备

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A near term, low cost 14 MeV neutron materials test facility has been designed that allows significant radiation damage (dpa, appm He, etc.) levels to be achieved typical of those that will be experienced in DT Demonstration or commercial DT power plants. The design described in this paper produces peak damage levels of approximate to 4-6 dpa/fpy in 15 cm(3) and has approximate to 600 cm(3) test volume covering the damage range from 1 to 6 dpa/fpy. The total active tritium inventory in the test facility is less than 1 g and the overall construction costs are also roughly unchanged from an earlier (2015) design. The time to initial operation remains at approximate to 4 years from the start of construction because it builds on an on-going project for radioisotope production already under construction. This latest facility design has the possibility to provide a 2 MW-y/m(2), 14 MeV neutron exposure to first wall materials in less than 4 fpy's of operation.
机译:设计了一种近期的低成本14 MeV中子材料测试设备,可以实现显着的辐射破坏(dpa,appm He等)水平,这是DT演示或商用DT电厂所经历的典型水平。本文中描述的设计在15 cm(3)中产生的峰值损伤水平约为4-6 dpa / fpy,测试体积约为600 cm(3),覆盖了1至6 dpa / fpy的损伤范围。测试设施中的总活性active存量少于1 g,总体建设成本与早期(2015年)设计相比也基本没有变化。从建造开始到开始运行的时间大约为4年,因为它建立在正在进行的放射性同位素生产项目的基础上。这种最新的设施设计有可能在不到4 fpy的运行时间内向第一壁材料提供2 MW-y / m(2),14 MeV中子暴露。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号