首页> 外文期刊>Fusion Engineering and Design >The value of modern decision-making support services to fusion projects
【24h】

The value of modern decision-making support services to fusion projects

机译:现代决策支持服务对融合项目的价值

获取原文
获取原文并翻译 | 示例
       

摘要

Regardless of the power generation process, whether fission or fusion, a nuclear power plant (NPP) is a complex system of thousands of components and equipment. It is also subject to stringent requirements in terms of safety, environmental impacts, schedule and cost-competitiveness.rnOperating experience from test and propulsion reactors recently designed and built by AREVA TA - more than 10 reactors with 4 different designs in the past 12 years - and from NPPs recently built in Asia and the AREVA NP EPR under construction at the Okiluoto site in Finland highlight the added value of the latest engineering methods.rnThese methods meet project management standards issued in the past five years and are based on a global approach and continuous improvement of the process. They significantly minimize risk for the customer, the public and the environment.rnThe scientific and technical complexities are significantly higher in the case of a new fusion power plant project. There is very little operating experience from previous scientific machine projects, especially in the fields of nuclear facility integration, nuclear safety culture, human factors, integrated logistics support, nuclear operations and decommissioning requirements to be factored in at the design and construction stages.rnExamples are provided from AREVA group experience to show the versatility of the engineering approach and present some successful adaptations of these methods in a variety of technical fields with varying levels of engineering responsibility.rnThis paper focus on decision-making support services in the following areas: performance management, interface management (including physical as well as functional interfaces) and integration management. The contribution of CAD and PDM (Product Data Management) is discussed. This paper describes how the fusion community can benefit from the best engineering practices of nuclear companies.
机译:无论发电过程是裂变还是聚变,核电站(NPP)都是由成千上万个组件和设备组成的复杂系统。它在安全性,环境影响,进度和成本竞争力方面也受到严格的要求。rn阿雷瓦塔(TAEVA)TA最近设计和建造的试验和推进反应堆的运行经验-过去12年中有10多种反应堆采用4种不同的设计-以及最近在亚洲建造的核电厂以及在芬兰的奥基卢托(Akiluoto)现场正在建造的阿海珐NP EPR突出了最新工程方法的附加价值。这些方法符合过去五年发布的项目管理标准,并且是基于全球方法和持续改进过程。它们极大地降低了对客户,公众和环境的风险。对于新的聚变电站项目,科学和技术的复杂性明显更高。从以前的科学机器项目获得的操作经验很少,特别是在设计和建造阶段要考虑的核设施集成,核安全文化,人为因素,综合后勤支持,核作战和退役要求等领域。由AREVA集团的经验提供,以展示工程方法的多功能性,并介绍这些方法在各种技术领域中具有不同工程责任水平的成功改编。本文重点关注以下领域的决策支持服务:绩效管理,界面管理(包括物理和功能界面)和集成管理。讨论了CAD和PDM(产品数据管理)的贡献。本文介绍了聚变社区如何从核公司的最佳工程实践中受益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号