机译:ITER真空容器的赤道和下部端口的结构分析
Hyundai Heavy Industries Co. Ltd., 102-18 Mabuk-dong, Giheung-gu, Yongin-si, Gyeonggi-do 446-716, Republic of Korea;
Hyundai Heavy Industries Co. Ltd., 102-18 Mabuk-dong, Giheung-gu, Yongin-si, Gyeonggi-do 446-716, Republic of Korea;
Hyundai Heavy Industries Co. Ltd., 102-18 Mabuk-dong, Giheung-gu, Yongin-si, Gyeonggi-do 446-716, Republic of Korea;
National Fusion Research Institute, Gwahangno 113, Yuseong-gu, Daejeon 305-333, Republic of Korea;
National Fusion Research Institute, Gwahangno 113, Yuseong-gu, Daejeon 305-333, Republic of Korea;
National Fusion Research Institute, Gwahangno 113, Yuseong-gu, Daejeon 305-333, Republic of Korea;
international thermonuclear experimental reactor (ITER); vacuum vessel (VV); equatorial port; lower port;
机译:ITER真空容器下端口接管延长部分的压力和烘烤测试的详细过程
机译:ITER真空容器第一部分和下部端口的制造进度
机译:韩国ITER真空容器下端口的制造设计
机译:ITER真空容器端口的最终设计和生产开始
机译:港口港口化化学船舶调度问题的研究,使用MIP,CP和优先职位调度启发式
机译:用于ITER的微裂变室的容器内组件的开发
机译:关于磨光机钻孔计概念设计的磨光机钻孔计的结构分析
机译:ITER真空容器的结构分析,具有光晕不对称的破坏载荷