首页> 外文期刊>Fusion Engineering and Design >Operability of the ITER Hot Cell Facility
【24h】

Operability of the ITER Hot Cell Facility

机译:ITER热室设施的可操作性

获取原文
获取原文并翻译 | 示例
           

摘要

The maintenance operation of the ITER in-vessel components are executed in the Hot Cell Facility (HCF). Therefore maintenance requirements and the operability analysis are essential inputs for the design. To fulfill the maintenance strategy, the HCF shall be capable of refurbishing and replacing vacuum vessel components and processing radwaste simultaneously. Based on the top level project requirements, the design scenario giving the most stringent constraints is based on the following tasks during the main shutdown: replacement of 54 cassettes, 3 Test Blanket Modules Port Plugs, the In Vessel Viewing System, the repair of 2 Equatorial and 2 Upper Port Plugs and the use of the Multi-Purpose Deployer. The operability between shutdowns needs also to be compliant with scheduled and unscheduled maintenance tasks. Furthermore, regular maintenance of the facility itself needs to be considered. This paper will outline the methodology, the basic tasks considered and it will present the schedule during shutdown and between shutdown periods. The goal is also to check the use rate of each workstation.
机译:在热室设备(HCF)中执行ITER车载组件的维护操作。因此,维护要求和可操作性分析是设计的重要输入。为了执行维护策略,HCF必须能够翻新和更换真空容器组件并同时处理垃圾。根据顶层项目要求,在最主要的停机期间,给出最严格限制的设计方案是基于以下任务:更换54个暗盒,3个测试橡皮布模块端口插头,船内查看系统,修理2个赤道仪和2个上部端口插头以及多功能部署器的使用。关闭之间的可操作性还需要符合计划的和计划外的维护任务。此外,需要考虑设施本身的定期维护。本文将概述方法,所考虑的基本任务,并将介绍停机期间和停机期间之间的时间表。目的还在于检查每个工作站的使用率。

著录项

  • 来源
    《Fusion Engineering and Design》 |2011年第11期|p.1894-1897|共4页
  • 作者单位

    ITER Organization, CS 90 046, 13067 St Paul Les Durance Cedex. France;

    ITER Organization, CS 90 046, 13067 St Paul Les Durance Cedex. France;

    ITER Organization, CS 90 046, 13067 St Paul Les Durance Cedex. France;

    ITER Organization, CS 90 046, 13067 St Paul Les Durance Cedex. France;

    UKAEA, The Manor Court. Chiiton, Oxfordshire. OX11 ORN, United Kingdom;

    UKAEA, The Manor Court. Chiiton, Oxfordshire. OX11 ORN, United Kingdom;

    ITER Organization, CS 90 046, 13067 St Paul Les Durance Cedex. France;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    maintenance; facility integration; operability;

    机译:保养;设施整合;可操作性;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号