首页> 外文期刊>Fusion Engineering and Design >Status of the beryllium tile bonding qualification activities for the manufacturing of the ITER first wall
【24h】

Status of the beryllium tile bonding qualification activities for the manufacturing of the ITER first wall

机译:ITER第一壁制造中铍瓷砖粘结资格活动的现状

获取原文
获取原文并翻译 | 示例
           

摘要

The preparation of the manufacturing of the ITER first wall involves a qualification stage. The qualification aims at demonstrating that manufacturers can deliver the needed reliability and quality for the beryllium to copper bond, before the manufacturing can commence. The qualification is done on semi-prototype, containing relevant features relative to the beryllium armour (about 1/6 of the panel size). The qualification is done by the participating parties, firstly by a manufacturing semi-prototype and then by testing it under heat flux. One semi-prototype is manufactured and is being tested, and further from other manufacturers are still to come. The qualification programme is accompanied by bond defect investigations, which aim at defining defect acceptance criteria. Qualification and defect acceptance programme are supported by thermal and stress analyses, with good agreement regarding the thermal results, and some insights about the governing factors to bond damage. (C) 2015 ITER Organization. Published by Elsevier B.V. All rights reserved.
机译:制造国际热核实验堆第一壁的准备工作涉及鉴定阶段。该资格旨在证明制造商可以在开始生产之前就提供铍与铜结合的所需可靠性和质量。鉴定是在半原型上完成的,其中包含与铍装甲相关的相关特征(约为面板尺寸的1/6)。参与方进行资格鉴定,首先是通过制造半原型,然后在热通量下对其进行测试。一种半原型已经制造出来并正在接受测试,而其他制造商还会推出更多半原型。资格认证计划伴随着粘结缺陷调查,旨在确定缺陷接受标准。合格和缺陷验收计划得到热和应力分析的支持,在热结果方面达成了良好的共识,并对粘合损伤的控制因素也有一些见解。 (C)2015 ITER组织。由Elsevier B.V.发布。保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号