首页> 外文期刊>Fusion Engineering and Design >EU contribution to the procurement of the ITER blanket first wall
【24h】

EU contribution to the procurement of the ITER blanket first wall

机译:欧盟为ITER毯子第一壁的采购做出贡献

获取原文
获取原文并翻译 | 示例
       

摘要

Fusion for Energy (F4E), the European Union's Domestic Agency for ITER, is responsible for the procurement of about 50% of the ITER blanket first wall (FW), called normal heat flux FW. A procurement strategy has been implemented by the In-Vessel Project Team at F4E aimed at mitigating technical and commercial risks for the procurement of ITER blanket FW panels, promoting as far as possible competition among industrial partners. This procurement strategy has been supported by an extensive Research and Development (R&D) programme, implemented over more than 15 years in Europe, to develop various fabrication technologies. It includes in particular the manufacture and testing of small-scale, medium scale mock-ups and full-scale prototypes of blanket FW panels. In this R&D programme, significant efforts have been devoted to the development of a reliable materials joining technique. Hot Isostatic Pressing was selected for the manufacture of the FW panels made from beryllium, copper chromium zirconium alloy and 316L(N)-IG austenitic stainless steel.
机译:欧盟的ITER国内机构,能源融合(F4E)负责采购ITER毯式第一壁(FW)约50%的热量,称为正常热通量FW。 F4E的船上项目团队已实施了一项采购策略,旨在降低ITER毯式FW面板采购的技术和商业风险,从而最大程度地促进行业合作伙伴之间的竞争。这项采购策略得到了广泛的研究与开发(R&D)计划的支持,该计划在欧洲实施了15年以上,以开发各种制造技术。它尤其包括橡皮布FW面板的小型,中型实体模型和全尺寸原型的制造和测试。在该研发计划中,已大力致力于开发可靠的材料连接技术。选择热等静压来制造由铍,铜铬锆合金和316L(N)-IG奥氏体不锈钢制成的FW面板。

著录项

  • 来源
    《Fusion Engineering and Design》 |2016年第ptaa期|661-665|共5页
  • 作者单位

    Fus Energy, Torres Diagonal Litoral B3,Carrer Josep Pla 2, B-08019 Barcelona, Spain;

    Fus Energy, Torres Diagonal Litoral B3,Carrer Josep Pla 2, B-08019 Barcelona, Spain;

    Fus Energy, Torres Diagonal Litoral B3,Carrer Josep Pla 2, B-08019 Barcelona, Spain;

    AREVA NP, Ctr Tech, F-71200 Le Creusot, France;

    Atmostat, Rue Rene Hamon 31, F-94815 Villejuif, France;

    Fus Energy, Torres Diagonal Litoral B3,Carrer Josep Pla 2, B-08019 Barcelona, Spain;

    Atmostat, Rue Rene Hamon 31, F-94815 Villejuif, France;

    Fus Energy, Torres Diagonal Litoral B3,Carrer Josep Pla 2, B-08019 Barcelona, Spain;

    Amec Foster Wheeler Plc, Booths Pk,Chelford Rd, Knutsford WA16 8QZ, England;

    Fus Energy, Torres Diagonal Litoral B3,Carrer Josep Pla 2, B-08019 Barcelona, Spain;

    AREVA NP, Ctr Tech, F-71200 Le Creusot, France;

    Leading Enterprises SL, Pasaje De La Aguera 39409, San Felices De, Spain;

    Iberdrola Ingn & Construcc SAU, Ave Manoteras 20, Madrid 28050, Spain;

    Leading Enterprises SL, Pasaje De La Aguera 39409, San Felices De, Spain;

    Amec Foster Wheeler Plc, Booths Pk,Chelford Rd, Knutsford WA16 8QZ, England;

    Fus Energy, Torres Diagonal Litoral B3,Carrer Josep Pla 2, B-08019 Barcelona, Spain;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    ITER; First wall procurement; Hot isostatic pressing; Beryllium;

    机译:国际热核实验堆;第一壁采购;热等静压;铍;
  • 入库时间 2022-08-18 00:38:23

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号