首页> 外文期刊>Fusion Engineering and Design >The 10 MW EPSM modulator and other key components for the KIT gyrotron test facility FULGOR
【24h】

The 10 MW EPSM modulator and other key components for the KIT gyrotron test facility FULGOR

机译:KIT回旋加速器测试设备FULGOR的10 MW EPSM调制器和其他关键组件

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In recent years Electron Cyclotron Resonance Heating (ECRH) has become the prime heating system on most fusion machines, due to the availability of gyro trons and transmission systems as reliable high power microwave sources. The Institute of Pulsed Power and Microwave Heating (IHM) at the Karlsruhe Institute of Technology (KIT) is at the center of European efforts in developing such gyrotrons, in collaboration with European industry and other research institutions. Two years ago, KIT has started the construction of a new gyrotron test facility FULGOR (Fusion Long Pulse Laboratory), which should satisfy the demands gyrotron testing poses over the next 2-3 decades. The paper describes the capabilities of FULGOR and the progress made in its construction. (C) 2017 Published by Elsevier B.V.
机译:近年来,由于回旋加速器和传输系统作为可靠的高功率微波源,电子回旋加速器共振加热(ECRH)已成为大多数聚变机上的主要加热系统。卡尔斯鲁厄理工学院(KIT)的脉冲功率和微波加热研究所(IHM)是欧洲与欧洲工业界和其他研究机构合作开发此类旋流器的中心。两年前,KIT已开始建造新的回旋加速器测试设备FULGOR(融合长脉冲实验室),该设备应满足未来2-3年回旋加速器测试提出的要求。本文描述了FULGOR的功能以及其构建方面的进展。 (C)2017由Elsevier B.V.发布

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号