ITER achievements by July l998 and future prospects

机译:到1998年7月ITER取得的成就和未来前景

获取原文
获取原文并翻译 | 示例
       

摘要

The four parties to the Agreement on Co-operation in the Engineering Design Activities for the International Thermonuclear Experimental Reactor (ITER) have successfully completed 6 years of collaborative work, the results of which are encapsulated in the ITER Final Design Report, Cost Review and Safety Analysis, (FDR) and supporting technical information, including the output from ongoing major technology R&D projects. The FDR provides a detailed, complete and fully integrated engineering design of ITER, including the latest assessment of ITER plasma performance and safety characteristics and of its cost which remains as originally agreed. The technical results provided should have been sufficient to allow a construction decision by the parties who have now found the investment too large to be affordable. Further development of the project, aimed at enabling a future possible decision on construction, includes design work to achieve cost reduction by reducing performance in ways that will still allow to meet ITER overall programmatic objectives; to adapt the design to specific site characterisations, and to prepare for regulatory procedures.
机译:《国际热核实验堆(ITER)工程设计活动合作协议》的四个缔约方已成功完成了6年的合作工作,其成果已封装在ITER最终设计报告,成本审查和安全性中分析,(FDR)和支持性技术信息,包括正在进行的主要技术研发项目的输出。 FDR提供了ITER的详细,完整和完全集成的工程设计,包括对ITER等离子体性能和安全特性及其成本的最新评估,该评估仍保持最初的约定。所提供的技术结果应足以使当事方作出建设决定,而当事方现在发现投资太大而无法负担。该项目的进一步发展旨在使将来可能作出关于建筑的决定,包括为降低成本而进行的设计工作,即通过降低性能以仍然能够满足国际热核实验堆总体规划目标的方式实现这一目标;使设计适应特定的站点特征,并为监管程序做准备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号