首页> 外文期刊>Fusion Engineering and Design >The fabrication and assembly of the beam source for the SPIDER experiment
【24h】

The fabrication and assembly of the beam source for the SPIDER experiment

机译:用于SPIDER实验的光束源的制造和组装

获取原文
获取原文并翻译 | 示例
       

摘要

The ITER Heating Neutral Beam injector (HNB) will be equipped with a beam source that will provide a negative beam of 40A (H or D). The R&D activities undertaken in Europe to pursue this challenging goal comprise three experiments:-ELISE - the half size ion source experiment operating in IPP Garching-SPIDER - the full size ion source experiment at Neutral Beam Test Facility (NBTF) site in Padua-MITICA - the full size full energy ITER injector prototype being also established at the NBTFThe procurement of the beam source for SPIDER started in October 2012, when a contract between Fusion for Energy and Thales, Microwave & Imaging Sub-Systems (as group leader of a Consortium created with CECOM Srl, Galvano-T GmbH and Zanon SpA) was signed. The scope of the contract has been completed in October 2017 with the delivery of the SPIDER beam source at the NBTF site in Padova Italy.A review of the fabrication of the main parts and of the aspects of their assembly is reported in the paper, with a focus on some of the major issue encountered and the achievement of tight alignment tolerances of the accelerator.
机译:ITER加热中性束注入器(HNB)将配备束源,该束源将提供40A(高或D)的负束。在欧洲为实现这一具有挑战性的目标而进行的研发活动包括三个实验:-ELISE-在IPP Garching-SPIDER上运行的半尺寸离子源实验-在帕多瓦-MITICA的中性束测试设施(NBTF)现场进行的全尺寸离子源实验-在NBTF上也建立了全尺寸全能ITER注射器原型SPIDER束源的采购始于2012年10月,当时Fusion for Energy与Thales,微波和成像子系统(作为财团的组长)签订了合同由CECOM Srl,Galvano-T GmbH和Zanon SpA共同创建。该合同的范围已于2017年10月完成,并在意大利帕多瓦的NBTF现场交付了SPIDER光束源,并在本文中报告了对主要零件的制造及其组装方面的评论,其中包括重点关注遇到的一些主要问题以及加速器的严格对准公差的实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号