Conceptual design of Integrated Bivalent Auxiliary System (SABI) supporting the MITICA cooling plant and cryogenic plant

机译:集成二价辅助系统(SABI)的概念设计,为MITICA冷却设备和低温设备提供支持

获取原文
获取原文并翻译 | 示例
       

摘要

The first ever built full-scale prototype of the ITER heating neutral beam injector is the MITICA experiment at PRIMA Neutral Beam Test Facility, under realization in Padova, Italy.This experiment consists of several in-vessel components: most of them are actively cooled by a large Cooling Plant, still under construction. Coolant is deionized water produced by a Chemical Control System (CCS).In the PRIMA facility, a cryogenic plant (currently in manufacturing phase) is also foreseen to serve the cryopumps to be installed in the MITICA Beam Line Vessel.During the installation of cooling plant and the design phase of cryogenic plant, two different issues came into evidence: waste water (produced by the CCS during operations) could not be delivered directly into the public network and the warm compressor of the cryogenic plant, originally air-cooled, changed to a water-cooled system.For the first issue the solution was found in a Water Treatment Unit (WTU) that requires the supply of hot water to distil the wastewater and to concentrate it.The second issue and the need to balance the heat loads and the cost and space constraints lead to an innovative system: it is essentially based on a high temperature water-water heat pump, by means of which the heat rejected by the warm compressor is used to heat up the WTU.Moreover this will reduce the operational costs by introducing a significant energy saving.
机译:ITER加热中性束注入器的第一个全尺寸原型是在意大利帕多瓦实现的PRIMA中性束测试设施上的MITICA实验,该实验由多个容器内组件组成:其中大多数通过主动冷却大型冷却装置,仍在建设中。冷却液是由化学控制系统(CCS)产生的去离子水,在PRIMA设施中,还预计将有一个低温工厂(目前处于生产阶段),以服务于将安装在MITICA Beam Line容器中的低温泵。工厂和低温工厂的设计阶段,出现了两个不同的问题:废水(CCS在运行过程中产生的废水)无法直接输送到公共网络中,而低温工厂的热压缩机(原来是空冷的)已经改变了。第一个问题是在水处理单元(WTU)中找到了解决方案,该单元需要提供热水来蒸馏废水并将其浓缩。第二个问题是需要平衡热负荷成本和空间限制导致了一个创新的系统:该系统主要基于高温水-水热泵,通过该泵,温暖的压缩机排出的热量被用于加热水。 WTU。此外,这将通过大大节省能源来降低运营成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号