首页> 外文期刊>FlyPast >'hurri-bomber' Moves Closer To Flight
【24h】

'hurri-bomber' Moves Closer To Flight

机译:“轰炸机”更接近飞行

获取原文
获取原文并翻译 | 示例
       

摘要

Hangar 11 Collection's newly-restored Hawker llb Hurricane BE505' (G-HHII) made the move from Hawker Restoration's Suffolk workshop to its owner's North Weald base on January 15. A specialist transport company supplied two low loaders, one to carry the fighter-bomber's fuselage and a wing, and the other a wing and the propeller. Low trees and cables ensured that the first mile out of the village was stressful! Since the aircraft's arrival in Essex, the wings have been fitted and all the controls connected. Undercarriage retraction tests have been completed, along with the final engine run.
机译:1月15日,机库11系列的新近恢复的小贩llb飓风BE505'(G-HHII)从小贩修复的萨福克工厂迁至其所有者的北威尔德基地。一家专业运输公司提供了两辆低架装载机,其中一架用于装载战斗轰炸机。机身和机翼,另一个机翼和螺旋桨。低矮的树木和电缆确保离开村庄的第一英里充满压力!自飞机抵达埃塞克斯(Essex)以来,机翼已安装完毕,所有控件均已连接。底盘回缩测试以及最终的发动机运行均已完成。

著录项

  • 来源
    《FlyPast》 |2009年第332期|p.6|共1页
  • 作者

    Peter Teichman;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 航空;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号