首页> 外文期刊>Fire >Boost for West Midlands and Staffordshire controls
【24h】

Boost for West Midlands and Staffordshire controls

机译:促进西米德兰兹郡和斯塔福德郡的控制

获取原文
获取原文并翻译 | 示例
           

摘要

Work is now underway to determine how the shared fire control facility might work. Part of that process includes examining the way in which we mobilise emergency vehicles to incidents, reviewing current working practices and the trialling of flexible working arrangements. Throughout the process, our priority will be to ensure that communities in both areas continue to receive a first class fire and rescue service. A bid for a sum of £4.1 m was submitted to DCLC to support the ambitious and far-reaching scope of the project and assist in creating a highly efficient fire control solution which covers both areas. We have since learnt that our bid was successful, though we did not receive the full amount of funding.
机译:目前正在确定共享的火控设施如何工作。该过程的一部分包括检查我们动员应急车辆以应对事故的方式,审查当前的工作惯例以及灵活的工作安排试行。在整个过程中,我们的首要任务是确保两个地区的社区继续获得一流的消防和救援服务。向DCLC提交了总价410万英镑的投标,以支持该项目雄心勃勃且影响深远的项目,并协助创建涵盖这两个领域的高效火控解决方案。此后,我们知道我们的投标成功了,尽管我们没有收到全部资金。

著录项

  • 来源
    《Fire》 |2012年第1346期|p.38|共1页
  • 作者

    Heather Challinor;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号