首页> 外文期刊>Fire Engineering >STRETCHING HOSELINES TO UPPER FLOORS OF RESIDENTIAL BUILDINGS, PART 1
【24h】

STRETCHING HOSELINES TO UPPER FLOORS OF RESIDENTIAL BUILDINGS, PART 1

机译:将软管拉伸到住宅建筑物的上层,第1部分

获取原文
获取原文并翻译 | 示例
       

摘要

Stretching a hoseline to an upper floor of an apartment building should be a fairly basic task for any fire department. Unfortunately, many departments today lack the personnel needed to rapidly stretch a hoseline through a courtyard, to an upper floor, and then advance it down a smoky hallway. Further, many departments outside the big cities do not configure their hosebeds to facilitate a rapid stretch up return-type stairs above the second floor. Folds or flakes of hose pulled from the main hosebed are generally too long to drag up stairs and around corners without the hose snagging on railings and other obstacles. Crosslays, of course, are shorter than the main hosebed and can be carried on the shoulder or under the arm instead of being dragged. Crosslays, however, are generally preconnected and limited to 200 feet in length. This isn't a lot of hose when you consider that it can take as much as one 50-foot section to ascend from floor to floor when hose is laid on return-type stairs.
机译:对于任何消防部门来说,将软管延伸到公寓楼的上层都是一项相当基本的任务。不幸的是,当今许多部门缺少所需的人员,这些软管无法快速将软管穿过庭院,延伸到较高的楼层,然后再将其从烟熏的走廊下移。此外,大城市以外的许多部门并没有配置其软管床,以利于快速伸展二楼以上的返回式楼梯。从主软管床上拉出的软管折叠或剥落通常太长,以至于不能向上拖楼梯和绕拐角,而软管不会卡在栏杆和其他障碍物上。当然,横纹比主胶管短,可以在肩部或手臂下方携带,而无需拖动。但是,交叉层通常是预先连接的,长度限制为200英尺。当您考虑将软管放置在返回式楼梯上时,从地板到地板的上升可能需要多达一个50英尺的截面,因此这并不是很多软管。

著录项

  • 来源
    《Fire Engineering》 |2003年第9期|p.63-6466|共3页
  • 作者

    BILL GUSTIN;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

  • 入库时间 2022-08-18 00:32:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号