【24h】

What We Learned

机译:我们学到了什么

获取原文
获取原文并翻译 | 示例
       

摘要

Webster groves (MO) fire-fighters had just completec morning chores on April 3 2003, and were meeting with the city manager to discuss impending staffing cuts when the dispatcher transmitted an alarm for "a fire behind Dobb's Tire" at 1235 Laclede Station Road. The initial assignment included four engines, a quint, an advanced life support (ALS) ambulance, and a battalion chief. Because the first-due engine was out of service, another engine company was assigned. As the companies responded, the dispatcher provided additional information that the fire was believed to be in the rear of Dobb's Tire and that she was receiving multiple phone calls. Based on this information and the large column of smoke visible from miles away, Chief of Department Michael Capriglione ordered a second alarm.
机译:韦伯斯特格罗夫(MO)消防员刚刚在2003年4月3日完成了凌晨的家务,当调度员在拉克莱德车站路1235号发出“多布轮胎后起火”警报时,正在与城市经理会面以讨论裁员的迫切性。最初的任务包括四个引擎,一个五重奏,一个高级生命支持(ALS)救护车和一个营长。由于先期发动机已停用,因此分配了另一家发动机公司。在公司做出回应时,调度员提供了更多信息,据信大火是在多布的轮胎的后部,并且她正在接听多个电话。根据这些信息以及几英里外可见的大烟柱,部门主任迈克尔·卡普里里奥内下令再次报警。

著录项

  • 来源
    《Fire Engineering》 |2003年第9期|p.106108-109|共3页
  • 作者

    LANCE PEEPLES;

  • 作者单位

    St. Louis County (MO) Fire Academy;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

  • 入库时间 2022-08-18 00:32:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号