In the aftermath of the collapse of the 40-year-old Minneapolis (MN) I-35W bridge on August 1, U.S. Secretary of Transportation Mary E. Peters has asked states to carefully consider the additional weight that might be placed on bridges during construction or repair projects. The National Transportation Safety Board (NTSB) has indicated that the gusset plates on the bridge may have been a factor in the collapse and that the weight of construction equipment and materials on the bridge may have been a source of stress, Peters said in a news release. She said she would immediately share with states information obtained through the NTSB investigation. The bridge, constructed in 1967, was built with a single 458-foot-long steel arch. Peters has also asked that all states immediately inspect any steel-deck truss bridges similar to the Minneapolis bridge.
展开▼
机译:8月1日,有40年历史的明尼阿波利斯(MN)I-35W大桥坍塌后,美国运输部长玛丽·E·彼得斯(Mary E. Peters)要求各州仔细考虑施工期间可能在桥梁上施加的额外重量或维修项目。彼得斯在新闻中说,美国国家运输安全委员会(NTSB)表示,桥上的角撑板可能是倒塌的一个因素,桥上的建筑设备和材料的重量可能是压力的来源。释放。她说,她将立即与各州共享通过NTSB调查获得的信息。这座桥建于1967年,建有一个458英尺长的钢拱。彼得斯还要求所有州立即检查任何与明尼阿波利斯桥相似的钢制桁架桥。
展开▼