首页> 外文期刊>Fire Engineering >Maximizing Training Evolutions in an Acquired Structure
【24h】

Maximizing Training Evolutions in an Acquired Structure

机译:在获得的结构中最大化培训发展

获取原文
获取原文并翻译 | 示例
       

摘要

This article discusses training options for an acquired structure that will be ultimately torn down. Live-training is the final evolution. We used this structure for hands-on training (H.O.T.) drills and planned to burn it within the next few months. Unfortunately, however, asbestos was found in the subflooring, and the owner had the structure torn down. In our area, the owner is responsible for removing or abating toxic substances before a structure can be demolished. The contractor used a method called "wet demolition" in which the structure is wet down with a hose during the demolition process to keep any asbestos from leaving the area. The debris is then disposed of in an approved dump site.
机译:本文讨论了最终将被拆除的购置结构的培训选项。现场培训是最终的发展。我们将这种结构用于动手训练(H.O.T.)演习,并计划在接下来的几个月内将其燃烧。但是,不幸的是,在地板下层发现了石棉,业主拆除了该结构。在我们地区,业主负责清除或减轻有毒物质,然后再拆除建筑物。承包商使用了一种称为“湿式拆除”的方法,该方法在拆除过程中用软管将结构浸湿,以防止石棉离开该区域。然后将残渣处置在批准的垃圾场。

著录项

  • 来源
    《Fire Engineering》 |2010年第4期|p.97-100102104106|共7页
  • 作者

    CURTIS RICE; BRUCE CLARK;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:29:21

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号